How to read this Encinitas tracker
Entries are grouped as Leucadia Streetscape, private projects, items on the City's capital list, and city plans. Each card gives the status with its own date and the source behind it. An approval is not a building permit, a capital list row is not a construction contract, and an anticipated completion date is the City's expectation on the day the page was written, not a finish date.
Sizes and costs are quoted the way each source writes them, and figures from different records are never added together. Where two sources disagree, as the City's two pages do on the Segment C West completion wording and as the Coastal Commission report does on hotel rooms, both versions are shown. One card covers one record; projects are never merged unless a quote ties them.
What is happening with Leucadia Streetscape?
The first card is the segment the City's pages describe as under construction; the next two are segments that appear as rows on the City's capital list; the last is background from earlier Coast News coverage of the plan as a whole.
Leucadia Streetscape Segment C West & N Coast Highway 101 Drainage (as the City's capital list names it)
Note: A construction contract is not a completion record; ask the City for the current schedule.
Location as the source states it: "between Jupiter Street and La Costa Avenue," as both City pages state it. Type: Street and drainage improvements.
Cost and funding as stated: Drainage grant, as the City's drainage page words it: "a $4M Grant from HUD was awarded to fund drainage infrastructure for 1.5 miles of new stormwater mainline".
Status (as the records state it; page checked October 14, 2026): Both City pages say the work "began construction in March 2024"; they word the anticipated completion differently (see below), and our research found no completion record.
- Undated page: Capital list (marked "Adopted: 06/18/2025"): the item is named "Leucadia Streetscape Segment C West & N Coast Highway 101 Drainage." [1]
- Undated page: City Engineering, North Highway 101 projects page, under its Leucadia Streetscape heading: "Segment C West and N Coast Hwy 101 Drainage Improvements, between Jupiter Street and La Costa Avenue, began construction in March 2024 with anticipated completion expected in late Summer/Fall 2026." The same page lists "New Roundabouts at Jupiter St. and Moorgate Rd." [2]
- Undated page: City drainage improvements page: "The N Coast Hwy 101 Drainage Improvements, as part of Leucadia Streetscape Segment C between Jupiter Street and La Costa Avenue, began construction in March 2024 with anticipated completion in Summer 2026." The page adds that "a $4M Grant from HUD was awarded to fund drainage infrastructure for 1.5 miles of new stormwater mainline." [3]
- Coast News report: "For Leucadia Streetscape Segment C West and North Highway 101 Drainage Improvements, the city approved contracts with Blue Pacific Engineering & Construction Company, Inc. ($20,252,466 for construction)." [4]
Where the sources differ:
- Expected completion: the North Highway 101 projects page says "late Summer/Fall 2026"; the drainage improvements page says "Summer 2026." Both are City pages read from archive copies, and neither is a completion record.
Record: City of Encinitas Engineering, Capital project list marked "Adopted: 06/18/2025" (read from an Internet Archive copy) [1]; City of Encinitas Engineering, North Highway 101 projects, Engineering capital improvements page (read from an Internet Archive copy) [2]; City of Encinitas Engineering, N Coast Hwy 101 drainage improvements page (read from an Internet Archive copy) [3]; The Coast News, Coast News report on Leucadia Streetscape contracts (read from an Internet Archive copy) [4]
Leucadia Streetscape Segment A South (as the City's capital list names it)
Note: The row is printed as the City's list prints it. Our quote of the row does not include the list's column headings, so this page does not say what the letters, the middle entry or the figure mean; ask City Engineering before relying on it.
Location as the source states it: "A St - Marcheta St," as the list prints the segment. Type: Capital list item.
Status (as of June 18, 2025): Listed on the capital list marked "Adopted: 06/18/2025" as: "X 21 Leucadia Streetscape Segment A South (A St - Marcheta St) TBD - $2,030,000".
- June 18, 2025: Capital list row: "X 21 Leucadia Streetscape Segment A South (A St - Marcheta St) TBD - $2,030,000." [1]
Record: City of Encinitas Engineering, Capital project list marked "Adopted: 06/18/2025" (read from an Internet Archive copy) [1]
Leucadia Streetscape Segment B (as the City's capital list names it)
Note: The row is printed as the City's list prints it. Our quote of the row does not include the list's column headings, so this page does not say what the letters, the middle entry or the figure mean; ask City Engineering before relying on it.
Location as the source states it: "Basil St - Jupiter St," as the list prints the segment. Type: Capital list item.
Status (as of June 18, 2025): Listed on the capital list marked "Adopted: 06/18/2025" as: "Y 22 Leucadia Streetscape Segment B (Basil St - Jupiter St) TBD - $13,560,000".
- June 18, 2025: Capital list row: "Y 22 Leucadia Streetscape Segment B (Basil St - Jupiter St) TBD - $13,560,000." [1]
Record: City of Encinitas Engineering, Capital project list marked "Adopted: 06/18/2025" (read from an Internet Archive copy) [1]
Earlier Leucadia Streetscape reports from the Coast News (background)
Note: These reports describe the plan as a whole. Our research did not confirm which later segment each roundabout belongs to.
Location as the source states it: "between A Street and La Costa Avenue," in the Coast News description of the roundabouts. Type: Earlier approvals and a contract award, shown as background to the segment entries above.
Status (as the records state it; page checked October 14, 2026): Background only; the Coast News reported a Coastal Commission approval, a later Council vote and a contract award for the plan's final phase.
- Coast News report: "received the California Coastal Commission's unanimous blessing." [5]
- Coast News report: "The City Council voted 4-1 at its Nov. 14 meeting to memorialize the commission's stipulations," and "The plans call for six roundabouts between A Street and La Costa Avenue." [6]
- Coast News report: The Council "awarded construction contracts for projects in the final phase of Leucadia Streetscape." The contract the same report names for Segment C West is shown in the Segment C West card above. [4]
Record: The Coast News, Coast News report on the Coastal Commission and Leucadia Streetscape [5]; The Coast News, Coast News report on the revised Leucadia Streetscape plan [6]; The Coast News, Coast News report on Leucadia Streetscape contracts (read from an Internet Archive copy) [4]
What private projects are planned in Encinitas?
These are hotel, mixed-use and tenant projects with a public record. Each card stands alone: our research did not find a quote that ties any two of them together, and the Moonlight Mixed-Use Project is listed even though its current status could not be verified, so that you know to ask.
1900 and 1950 North Coast Highway 101 (California Coastal Commission report)
Note: The report's location line names San Diego County rather than a city. Confirm with the City of Encinitas planning staff that the parcels are within the City before relying on this entry.
Location as the source states it: "Location: 1900 and 1950 North Coast Highway 101, San Diego County," as the report's location line reads. Type: Hotel and apartments, per the report; the parcels "are zoned for Limited Visitor Serving Commercial with a Residential Overlay". Size as stated: "94 residential apartments (75 market rate and 19 low- income units)"; the hotel room count differs within the report (see below).
Status (as of October 12, 2023): Commission action on October 12, 2023, as the report states; our quoted sentence ends before saying what the Commission found, and our research did not confirm a later status.
- October 12, 2023: Coastal Commission report: "On October 12, 2023, the Commission found that the project approved by the City of" (the quoted passage ends there). [7]
- Undated page: The report describes a "hotel mixed-use development at 1900 & 1950 North Coast Highway 101. The development will consist of 94 residential apartments (75 market rate and 19 low- income units)," and refers both to "a 36 room hotel with 6 moderate-cost rooms and 3 lower-cost rooms" and to "a 34-room hotel with eight economy/affordable rooms." [7]
Where the sources differ:
- Hotel rooms: the same report refers to "a 36 room hotel with 6 moderate-cost rooms and 3 lower-cost rooms" and to "a 34-room hotel with eight economy/affordable rooms." Our quotes do not show which version is the current one; ask the City and the Coastal Commission.
Record: California Coastal Commission, Staff report on 1900 and 1950 North Coast Highway 101 [7]
Planning Commission approval in Old Encinitas (Coast News)
Note: The size is a separate sentence of the same report. Our research found no permit, groundbreaking or completion record after the approval.
Location as the source states it: "in Old Encinitas," with the proposal's winery "at the dead end of Second Street," in two consecutive sentences of the Coast News report. Type: Mixed-use residential development, as the report describes it. Size as stated: The same report also describes plans to "create 18 airspace condominium units and 2,694 square feet of commercial space".
Status (as the records state it; page checked October 14, 2026): Approved by the Planning Commission "during its Dec. 21 meeting," per a Coast News report; our research found no later status.
- Coast News report: "The Encinitas Planning Commission unanimously approved plans for a new mixed-use residential development project in Old Encinitas during its Dec. 21 meeting. Dominic Burtech's infill proposal includes 16 residential condominium units and two commercial units to house Burtech Family Vineyard's winery at the dead end of Second Street." The same report also describes plans to "create 18 airspace condominium units and 2,694 square feet of commercial space." [8]
Where the sources differ:
- Unit count: the report's opening sentences and its later description give different condominium counts. Our research did not find which one the approval covers; ask the City's planning staff.
Record: The Coast News, Coast News report on a Planning Commission approval in Old Encinitas (read from an Internet Archive copy) [8]
Encinitas Brewing Company at 1588 Leucadia Blvd
Note: Our quoted words do not name the body that approved the permits.
Location as the source states it: "the vacant space at 1588 Leucadia Blvd," per the Coast News. Type: Brewery tenant in an existing commercial space. Size as stated: "a 5,500-square-foot space next to REI" (Coast News).
Status (as the records state it; page checked October 14, 2026): Permits approved, per a Coast News report; our research did not confirm an opening date.
- Coast News report: "approved a series of permits for Encinitas Brewing Company to occupy the vacant space at 1588 Leucadia Blvd in the Plaza at Encinitas Ranch shopping center, taking over the former Islands Restaurant location. The proposed business would fill a 5,500-square-foot space next to REI." [9]
Record: The Coast News, Coast News report on Encinitas Brewing Company permits (read from an Internet Archive copy) [9]
Boutique hotel proposed along the La Costa Avenue corridor (as the Coast News describes it)
Note: The two phrases are separate quotes from one report. Our research did not confirm from a single sentence that the 17-room figure describes this hotel, so treat the size as unconfirmed.
Location as the source states it: "along the La Costa Avenue corridor"; our quotes give no street address. Type: Proposed boutique hotel. Size as stated: The same report refers to "a 17-room establishment featuring a small restaurant".
Status (as the records state it; page checked October 14, 2026): Proposed, per a Coast News report; our research found no later status.
- Coast News report: "a boutique hotel proposed along the La Costa Avenue corridor," and, in the same report, "a 17-room establishment featuring a small restaurant." [10]
Record: The Coast News, Coast News report on La Costa Avenue proposals [10]
Moonlight Mixed-Use Project
Note: Our October 2026 research did not find an approval, a denial, a withdrawal or a construction record for this project. Ask the City's planning staff for its current status.
Location as the source states it: Not stated in our quote. Type: Mixed-use, per its name.
Status (as the records state it; page checked October 14, 2026): Status unverified: the only record our research found is a Coast News report saying plans had been submitted.
- Coast News report: "the firm has submitted plans to the city for its Moonlight Mixed-Use Project." [11]
Record: The Coast News, Coast News report on the Moonlight Mixed-Use Project [11]
Infrastructure: rows from the City's capital project list
The City Engineering document marked "Adopted: 06/18/2025" lists capital items as rows. The cards below print each row exactly as our research quoted it. Our quotes do not include the list's column headings, so this page does not interpret the letters, the words "No" or "GRANT," or the dollar figures. Ask the City which agency leads each row.
Leucadia At-Grade Rail Crossings (as the City's capital list names it)
Note: The row is printed as the City's list prints it. Our quote of the row does not include the list's column headings, so this page does not say what the letters, the middle entry or the figure mean; ask City Engineering before relying on it.
Location as the source states it: As the item name states; our quotes give no further location. Type: Capital list item.
Status (as of June 18, 2025): Listed on the capital list marked "Adopted: 06/18/2025" as: "FF 9 Leucadia At-Grade Rail Crossings No - $6,150,000".
- June 18, 2025: Capital list row: "FF 9 Leucadia At-Grade Rail Crossings No - $6,150,000." [1]
Record: City of Encinitas Engineering, Capital project list marked "Adopted: 06/18/2025" (read from an Internet Archive copy) [1]
Citywide Rail Corridor Quiet Zone (as the City's capital list names it)
Note: The row is printed as the City's list prints it. Our quote of the row does not include the list's column headings, so this page does not say what the letters, the middle entry or the figure mean; ask City Engineering before relying on it.
Location as the source states it: As the item name states; our quotes give no further location. Type: Capital list item.
Status (as of June 18, 2025): Listed on the capital list marked "Adopted: 06/18/2025" as: "EE 41 Citywide Rail Corridor Quiet Zone No - $13,400,000".
- June 18, 2025: Capital list row: "EE 41 Citywide Rail Corridor Quiet Zone No - $13,400,000." [1]
Record: City of Encinitas Engineering, Capital project list marked "Adopted: 06/18/2025" (read from an Internet Archive copy) [1]
Verdi Ave Pedestrian Undercrossing (as the City's capital list names it)
Note: The row is printed as the City's list prints it. Our quote of the row does not include the list's column headings, so this page does not say what the letters, the middle entry or the figure mean; ask City Engineering before relying on it.
Location as the source states it: As the item name states; our quotes give no further location. Type: Capital list item.
Status (as of June 18, 2025): Listed on the capital list marked "Adopted: 06/18/2025" as: "AA 59 Verdi Ave Pedestrian Undercrossing No - $17,850,000".
- June 18, 2025: Capital list row: "AA 59 Verdi Ave Pedestrian Undercrossing No - $17,850,000." [1]
Record: City of Encinitas Engineering, Capital project list marked "Adopted: 06/18/2025" (read from an Internet Archive copy) [1]
N Vulcan Ave Storm Drain Mainline (Union St - La Costa Ave) (as the City's capital list names it)
Note: The row is printed as the City's list prints it. Our quote of the row does not include the list's column headings, so this page does not say what the letters, the middle entry or the figure mean; ask City Engineering before relying on it.
Location as the source states it: As the item name states; our quotes give no further location. Type: Capital list item.
Status (as of June 18, 2025): Listed on the capital list marked "Adopted: 06/18/2025" as: "TT 56 N Vulcan Ave Storm Drain Mainline (Union St - La Costa Ave) No - - $15,350,000".
- June 18, 2025: Capital list row: "TT 56 N Vulcan Ave Storm Drain Mainline (Union St - La Costa Ave) No - - $15,350,000." [1]
Record: City of Encinitas Engineering, Capital project list marked "Adopted: 06/18/2025" (read from an Internet Archive copy) [1]
S Encinitas Blvd Protected Bike Lane & Capacity Enhancements GRANT (as the City's capital list names it)
Note: The row is printed as the City's list prints it. Our quote of the row does not include the list's column headings, so this page does not say what the letters, the middle entry or the figure mean; ask City Engineering before relying on it.
Location as the source states it: As the item name states; our quotes give no further location. Type: Capital list item.
Status (as of June 18, 2025): Listed on the capital list marked "Adopted: 06/18/2025" as: "S Encinitas Blvd Protected Bike Lane & Capacity Enhancements GRANT".
- June 18, 2025: Capital list row: "S Encinitas Blvd Protected Bike Lane & Capacity Enhancements GRANT." [1]
Record: City of Encinitas Engineering, Capital project list marked "Adopted: 06/18/2025" (read from an Internet Archive copy) [1]
Santa Fe Dr Corridor Improvements (Eastern Phase) (as the City's capital list names it)
Note: The row is printed as the City's list prints it. Our quote of the row does not include the list's column headings, so this page does not say what the letters, the middle entry or the figure mean; ask City Engineering before relying on it.
Location as the source states it: As the item name states; our quotes give no further location. Type: Capital list item.
Status (as of June 18, 2025): Listed on the capital list marked "Adopted: 06/18/2025" as: "H 48 Santa Fe Dr Corridor Improvements (Eastern Phase) GRANT".
- June 18, 2025: Capital list row: "H 48 Santa Fe Dr Corridor Improvements (Eastern Phase) GRANT." [1]
Record: City of Encinitas Engineering, Capital project list marked "Adopted: 06/18/2025" (read from an Internet Archive copy) [1]
Leucadia Blvd Roundabout at Hygeia Ave (as the City's capital list names it)
Note: The row is printed as the City's list prints it. Our quote of the row does not include the list's column headings, so this page does not say what the letters, the middle entry or the figure mean; ask City Engineering before relying on it.
Location as the source states it: As the item name states; our quotes give no further location. Type: Capital list item.
Status (as of June 18, 2025): Listed on the capital list marked "Adopted: 06/18/2025" as: "T 43 Leucadia Blvd Roundabout at Hygeia Ave (Roundabout Only) GRANT - $3,900,000".
- June 18, 2025: Capital list row: "T 43 Leucadia Blvd Roundabout at Hygeia Ave (Roundabout Only) GRANT - $3,900,000." [1]
Record: City of Encinitas Engineering, Capital project list marked "Adopted: 06/18/2025" (read from an Internet Archive copy) [1]
City plans: what guides development in Encinitas?
These are the plans in our record, each as a source states it. A plan is not a project. The specific plans are named in the official code host's table of contents; our research could not read their text, so no rules from them are quoted, and any code text may have been amended since. Confirm the current text with the City.
Sixth Cycle Housing Element (2021-2029)
Kind: Housing Element. Adoption and status: "On April 7, 2021, City Council adopted the Sixth Cycle Housing Element (2021-2029)," per the City's housing plan page.
- April 7, 2021: City Development Services: "On April 7, 2021, City Council adopted the Sixth Cycle Housing Element (2021-2029)." The page adds: "The adopted Housing Element has been submitted to HCD for their 90 day review." [12]
- Undated page: The same page refers to "a mid-cycle update to reflect progress towards implementing the 6th Cycle Housing Element by April 15, 2025." Our research did not find a record of that update. [12]
Record: City of Encinitas Development Services, Housing Plan Update 2021-2029 (read from an Internet Archive copy) [12]
City budget, as North Coast Current reports it
Kind: Annual budget, as reported. Adoption and status: "The City Council unanimously approved the budget June 17," per North Coast Current; that sentence does not name a fiscal year.
- North Coast Current report: "The City Council unanimously approved the budget June 17." The same report says "adopted a $149.2 million budget in June for fiscal year 2026-27" and "The General Fund, which supports core municipal services, is budgeted to receive $121.7 million in revenue." [16]
Record: North Coast Current, North Coast Current report on the Encinitas budget [16]
Downtown Encinitas Specific Plan
Kind: Specific plan listed in the municipal code's table of contents.
- Undated page: The official code host's table of contents, linked from the City's municipal code page, lists the "Downtown Encinitas Specific Plan." Our research could not read its text, because the code host blocks scripts. [13]
Record: City of Encinitas (official code host), Municipal Code page linking the official code host (read from an Internet Archive copy) [13]
North 101 Corridor Specific Plan
Kind: Specific plan listed in the municipal code's table of contents.
- Undated page: The official code host's table of contents, linked from the City's municipal code page, lists the "North 101 Corridor Specific Plan." Our research could not read its text, because the code host blocks scripts. [13]
Record: City of Encinitas (official code host), Municipal Code page linking the official code host (read from an Internet Archive copy) [13]
Cardiff-By-The-Sea Specific Plan
Kind: Specific plan listed in the municipal code's table of contents.
- Undated page: The official code host's table of contents, linked from the City's municipal code page, lists the "Cardiff-By-The-Sea Specific Plan." Our research could not read its text, because the code host blocks scripts. [13]
Record: City of Encinitas (official code host), Municipal Code page linking the official code host (read from an Internet Archive copy) [13]
Encinitas Ranch Specific Plan
Kind: Specific plan listed in the municipal code's table of contents.
- Undated page: The official code host's table of contents, linked from the City's municipal code page, lists the "Encinitas Ranch Specific Plan." Our research could not read its text, because the code host blocks scripts. [13]
Record: City of Encinitas (official code host), Municipal Code page linking the official code host (read from an Internet Archive copy) [13]
Home Depot Specific Plan
Kind: Specific plan listed in the municipal code's table of contents.
- Undated page: The official code host's table of contents, linked from the City's municipal code page, lists the "Home Depot Specific Plan." Our research could not read its text, because the code host blocks scripts. [13]
Record: City of Encinitas (official code host), Municipal Code page linking the official code host (read from an Internet Archive copy) [13]
El Camino Real Specific Plan
Kind: Specific plan listed in the municipal code's table of contents.
- Undated page: The official code host's table of contents lists the "El Camino Real Specific Plan." [13]
- Undated page: A State of California CEQAnet record describes the plan area as "covering the geographic area along El Camino Real from roughly Encinitas Boulevard to the south to Olivenhain Road to the north." [14]
Record: City of Encinitas (official code host), Municipal Code page linking the official code host (read from an Internet Archive copy) [13]; State of California CEQAnet, El Camino Real Specific Plan record [14]
Encinitas General Plan
Kind: General Plan. Adoption and status: Not stated in our quote.
- Undated page: The City's General Plan page offers a link labelled "View Encinitas General Plan Documents." Our October 2026 research did not retrieve the documents, so no adoption year or element is given here. [15]
Record: City of Encinitas, General Plan [15]
What to ask about a project near your property
If you lease or own on North Coast Highway 101 in Leucadia, ask City Engineering which work is still under way in front of your building, how access and parking will be handled until it ends, and when the City expects to close out the contract. Whether a lease addresses construction next to the storefront is a question for the landlord or a California attorney.
If a private project is planned beside your building, ask the City's planning staff for the approval record and its conditions, and check whether a later filing has changed the size quoted here. For a capital list row, ask what its columns mean before you treat the figure as a budget.
If a project on this page sits near a building you own, note the address and the project you are watching. The lease-my-building page builds that note on your device for a future California licensee; nothing is sent, and you keep the file.
Prepare a note about your buildingQuestions people ask
When will Leucadia Streetscape Segment C be finished?
The City's pages differ. The North Highway 101 projects page says Segment C West and the drainage improvements between Jupiter Street and La Costa Avenue began construction in March 2024 with anticipated completion expected in late Summer/Fall 2026; the drainage improvements page says anticipated completion in Summer 2026. Our research found no completion record.
What does a Coastal Commission report describe at 1900 and 1950 North Coast Highway 101?
A California Coastal Commission report describes a "hotel mixed-use development at 1900 & 1950 North Coast Highway 101. The development will consist of 94 residential apartments (75 market rate and 19 low- income units)." The same report refers both to a 36 room hotel and to a 34-room hotel, so the room count is shown as unresolved. This page gives no current status; ask the City for it, and confirm that the parcels are within Encinitas.
Is a brewery opening at 1588 Leucadia Blvd?
A Coast News report says permits were approved for Encinitas Brewing Company to occupy the vacant space at 1588 Leucadia Blvd, and in the next sentence that the business would fill a 5,500-square-foot space next to REI. Our research did not confirm an opening date.
When did Encinitas adopt its Housing Element?
The City says the City Council adopted the Sixth Cycle Housing Element (2021-2029) on April 7, 2021, and that it was submitted to HCD for its 90 day review.
Sources
- Capital project list marked "Adopted: 06/18/2025" (read from an Internet Archive copy), City of Encinitas Engineering, document marked "Adopted: 06/18/2025". Accessed October 14, 2026.
- North Highway 101 projects, Engineering capital improvements page (read from an Internet Archive copy), City of Encinitas Engineering, no publication date captured; checked October 14, 2026. Accessed October 14, 2026.
- N Coast Hwy 101 drainage improvements page (read from an Internet Archive copy), City of Encinitas Engineering, no publication date captured; checked October 14, 2026. Accessed October 14, 2026.
- Coast News report on Leucadia Streetscape contracts (read from an Internet Archive copy), The Coast News, dateline September 18, 2023. Accessed October 14, 2026.
- Coast News report on the Coastal Commission and Leucadia Streetscape, The Coast News, dateline October 12, 2018. Accessed October 14, 2026.
- Coast News report on the revised Leucadia Streetscape plan, The Coast News, dateline November 21, 2018. Accessed October 14, 2026.
- Staff report on 1900 and 1950 North Coast Highway 101, California Coastal Commission, no publication date captured; checked October 14, 2026. Accessed October 14, 2026.
- Coast News report on a Planning Commission approval in Old Encinitas (read from an Internet Archive copy), The Coast News, dateline December 29, 2023. Accessed October 14, 2026.
- Coast News report on Encinitas Brewing Company permits (read from an Internet Archive copy), The Coast News, dateline March 9, 2026. Accessed October 14, 2026.
- Coast News report on La Costa Avenue proposals, The Coast News, dateline August 28, 2024. Accessed October 14, 2026.
- Coast News report on the Moonlight Mixed-Use Project, The Coast News, dateline November 13, 2021. Accessed October 14, 2026.
- Housing Plan Update 2021-2029 (read from an Internet Archive copy), City of Encinitas Development Services, no publication date captured; checked October 14, 2026. Accessed October 14, 2026.
- Municipal Code page linking the official code host (read from an Internet Archive copy), City of Encinitas (official code host), no publication date captured; checked October 14, 2026. Accessed October 14, 2026.
- El Camino Real Specific Plan record, State of California CEQAnet, no publication date captured; checked October 14, 2026. Accessed October 14, 2026.
- General Plan, City of Encinitas, no publication date captured; checked October 14, 2026. Accessed October 14, 2026.
- North Coast Current report on the Encinitas budget, North Coast Current, dateline July 1, 2026. Accessed October 14, 2026.